The Electrician's Day
Aidan and apprentice arrived around 11.30am and we spent the following hour or so discussing just what we needed and wanted in the way of sockets etc.,
We agreed on 3 double sockets, two light fittings, one for a wall light and the other for a central, overhead light, and finally two sockets with TV and DAB radio points.
All went well and they finished around 3.30pm.
We now have the plumber first thing tomorrow morning, 7.45am as he wants to get some pipes moved before the plasterer gets here around 8.30am.
Builder to finish floor, and path outside, should be here Thursday, or it could be Friday!
A little light cheer for an empty conservatory.
Double switch for wall light and ceiling light.
Double electrical socket alongside TV|Radio socket.
Double electrical socket alongside TV|Radio socket.
That's it for today.